6. Determine the status of the drive from the drive LED definition .
7. Install the front bezel .
8. To configure drive arrays, see the relevant storage controller guide .
ResultsResults
The installation is complete.
Installing an Installing an E3.S E3.S drivedrive
About this taskAbout this task
CAUTION:CAUTION: A discharge of static electricity from a finger or other conductor might damage system boards or other static-
sensitive devices. To prevent damage, observe antistatic precautions.
CAUTION:CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated with
either a component or a blank.
ProcedureProcedure
1. Back up all server data.
2. If installed, remove the front bezel .
3. Remove the drive blank.
Retain the blank for future use.
4. Prepare the drive.