8. Install the access panel .
9. Install the server in the rack.
10. Connect each power cord to the server.
11. Connect each power cord to the power source.
12. Power up the server .
ResultsResults
The installation is complete.
Installing the 4LFF display port/USB optionInstalling the 4LFF display port/USB option
PrerequisitesPrerequisites
Be sure you have the following:
The components included with the hardware option kit
T-10 Torx screwdriver
ProcedureProcedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
4. Using a Torx T-10 screwdriver, remove the 4LFF display port/USB blank.