EasyManua.ls Logo

HPE ProLiant DL360 Gen11

HPE ProLiant DL360 Gen11
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the server into the rackInstalling the server into the rack
PrerequisitesPrerequisites
Before you perform this procedure, review the:
Rack warnings and cautions
Server warnings and cautions
Space and airflow requirements
T-25 Torx screwdriver
ProcedureProcedure
1. Extend the slide rails out on the mounting rails until they hit the internal stops and lock into place.
2. Install the server into the rack:
a. Insert the inner rails into the slide rails (callout 1).
b. Slide the server into the rack until the chassis ears are flush against the rack posts (callout 2).
HPE ProLiant DL360 Gen11 Server User Guide 87

Other manuals for HPE ProLiant DL360 Gen11

Related product manuals