EasyManua.ls Logo

HPE ProLiant ML110 Gen10

HPE ProLiant ML110 Gen10
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
• Server in rack mode: Install the server into the rack.
• Server in tower mode: Return the server to an upright position.
14. Connect all peripheral cables to the server.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
17.
Power up the server.
The installation is complete.
Installing the serial port option
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Serial port option
• T-15 Torx screwdriver
Procedure
1.
Power down the server.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
• Server in rack mode:
Remove the server from the rack.
• Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6. Remove the PCI air bale.
7.
Remove the system air bale.
8. Remove the serial port slot blank:
a. Open the PCI slot retainer.
Hardware options installation
104

Table of Contents

Other manuals for HPE ProLiant ML110 Gen10

Related product manuals