EasyManua.ls Logo

HPE ProLiant ML110 Gen10

HPE ProLiant ML110 Gen10
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22.
Power up the server.
The installation is complete.
Installing the eight-bay SFF hot-plug drive cage
The eight-bay SFF hot-plug drive cage can be installed in both box 1 and box 2.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Eight-bay SFF hot-plug drive cage option
• SFF hot-plug drive option
• T-15 Torx Screwdriver
Procedure
1.
Power down the server.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
• Server in rack mode:
Remove the server from the rack.
• Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the front bezel.
7.
Remove the PCI air bale.
8.
Remove the system air bale.
9. Disconnect all existing drive cage cables.
10. Remove the installed drive cage assembly.
Hardware options installation
69

Table of Contents

Other manuals for HPE ProLiant ML110 Gen10

Related product manuals