11. Install the drive cage in box 1.
12.
Connect the drive cables.
13.
Install the LFF hot-plug drives.
14. Install the system air bale.
15.
Install the PCI air bale.
16. Install the front bezel.
17.
Install the access panel.
18. Do one of the following:
• Server in rack mode: Install the server into the rack.
• Server in tower mode: Return the server to an upright position.
19. Connect all peripheral cables to the server.
Hardware options installation
68