EasyManua.ls Logo

HPE ProLiant ML110 Gen10

HPE ProLiant ML110 Gen10
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an LFF non-hot-plug drive
Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. Do one of the following:
• Server in rack mode:
Remove the server from the rack.
• Server in tower mode:
Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the front bezel.
7.
Remove the PCI air bale.
8.
Remove the system air bale.
9.
Disconnected all existing drive cage cables.
10.
Remove the installed drive cage.
11. Use the screws on the non-hot-plug drive cage to install the drives.
Hardware options installation
46

Table of Contents

Other manuals for HPE ProLiant ML110 Gen10

Related product manuals