10. Connect the serial port cable.
11.
Close the PCI slot retainer.
12.
Install the system air bale.
13. Install the PCI air bale.
14.
Install the access panel.
15. Do one of the following:
• Server in rack mode: Install the server into the rack.
• Server in tower mode: Return the server to an upright position.
16. Connect all peripheral cables to the server.
17. Connect each power cord to the server.
Hardware options installation
106