Procedure
1. Back up all server data.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
• Server in rack mode:
Remove the server from the rack.
• Server in tower mode:
Position the tower server for hardware configuration.
6. Remove the access panel.
7.
Remove the PCI air bale.
8.
Remove the system air bale.
9.
Remove the energy pack holder slot covers.
10. Install the energy pack holder.
Hardware options installation
79