EasyManua.ls Logo

HPE ProLiant XL270d Gen9 - Page 106

HPE ProLiant XL270d Gen9
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13. Install the dedicated iLO management port card.
14. If removed from slot 10, install the expansion board.
15. Connect any required cables.
16. Install the drive cage assembly.
17. Connect all cables to the drive backplane.
18. Install the air baffle.
If the 4:1 riser signal cable or Smart Storage Battery are installed in the air baffle, reconnect the cables to
the risers. For more information, see "Installing the air baffle."
19. Install the access panel.
20. Install the server into the chassis.
21. Connect all peripheral cables to the server .
22. Power up the server .
106 Hardware options installation

Table of Contents

Related product manuals