EasyManua.ls Logo

HPE StoreOnce 3620

HPE StoreOnce 3620
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Storage enclosure drawer, I/O module, and port numbering
D1D2
IOM A
IOM B
IOM A
IOM B
P2
P1
P2
P1
P2
P1
P2
P1
Cabling the first upgrade enclosure (JBOD 2)
The first upgrade enclosure is located directly above the server node.
Procedure
1. Apply the "JBOD2" label to the rear of the enclosure.
2. Apply the cable labels to the new SAS cables. The new 2 m SAS cable also requires the "F=2" label.
SAS cable Label color New label
New 0.5 m cable Red J2:D2:IA:P1 - J2:D1:IA:P2
New 0.5 m cable Green J2:D2:IB:P1 - J2:D1:IB:P2
New 1 m cable Red N:S6:P1 - J2:D1:IA:P1
New 2 m cable Green N:S6:P2 - JF:D2:IB:P2
White F=2
3. Cable the first upgrade enclosure (JBOD 2) as shown.
Installing capacity upgrade kits 115

Table of Contents

Related product manuals