The base system requires 4U. The server and base storage enclosure each require 2U.
The system supports up to five capacity upgrade storage enclosures. Each enclosure requires 2U.
The storage enclosures must be installed in the locations shown.
1
2
3
4
5
6
7
Figure 13: HPE StoreOnce 5200 System rack layout
Item Description
1 JBOD 6: Fifth capacity upgrade kit. Install above JBOD 4.
2 JBOD 4: Third capacity upgrade kit. Install above JBOD 2.
3 JBOD 2: First capacity upgrade kit. Install above the server.
4 Server node.
5 JBOD 1: Base enclosure. Install under the server.
6 JBOD 3: Second capacity upgrade kit. Install under JBOD 1.
7 JBOD 5: Fourth capacity upgrade kit. Install under JBOD 3.
2. Install two power cords for the server and each storage enclosure.
HPE StoreOnce 5200 System handling requirements
Component Rack space Weight
System server 2U 29 kg (64 lbs)
Storage enclosures 2U 27.2 kg (60 lbs)