EasyManua.ls Logo

HSD ES327 - 5 General Post-Installation Checks; Pre Start-Up Checks

HSD ES327
122 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 General post-installation checks
HSD S.p.A. © - 0105h00a.fm100713
67
5 General post-installation checks
5.1 Pre start-up checks
5.1.1 Positioning of the electrospindle
5.1.2 Pneumatic circuit
The pneumatic circuit pipes must have the diameter specified in section 4.6 “Pneumatic
connections”, and must supply dry, filtered compressed air in accordance with that indicated;
for connections, see possible labels on the product, and section 4.6 “Pneumatic connections”;
the cone cleaning air must be present during the tool change;
the progress of the tool holder cone ejection must be that specified in section 6.5 “Tool holder
locking and ejection device”.
Check that there are no jets of compressed air, water or other liquids directed
towards the electrospindle labyrinth ( see section 2 “Technical Specifications”).

Table of Contents

Related product manuals