EasyManua.ls Logo

Huawei FusionServer Pro 2288H V5 - 7.4 Initial Configuration

Huawei FusionServer Pro 2288H V5
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 7-19 Removing a cable (for an IB NIC with two 56 Gbit/s ports as an example)
2. Connect the new cable.
Remove the dust-proof cap on the port, and insert the cable connector into the port.
When you hear a "click" and the cable cannot be pulled out, the connector is secured.
Figure 7-20 Connecting a cable (for an IB NIC with two 56 Gbit/s ports as an example)
Step 5 Check whether the new cable is properly connected.
Power on the device. If the LOM indicator is green, the cable is properly connected.
Step 6 Bind the new optical cable.
FusionServer Pro 2288H V5 Server
User Guide
7 Installation and Configuration
Issue 08 (2019-10-30) Copyright © Huawei Technologies Co., Ltd. 93

Table of Contents

Other manuals for Huawei FusionServer Pro 2288H V5

Related product manuals