Figure 4-37 Installing an RHUB power cable
----End
4.5 Checking the RHUB Hardware Installation
After an RHUB is installed, check the installation of hardware including the devices and related
cables.
Table 4-4 lists the hardware installation checking items.
Table 4-4 Hardware installation checking list
No. Item
1 The position for each device conforms to the engineering design and meets the
space requirement.
2 Ensure that the RHUB is properly installed.
3 The surface of the RHUB is neat and clean. The external paint is intact. The labels,
tags, and nameplates are correct, legible, and complete.
Table 4-5 lists the checking list of the power cable and PGND cable connections.
Table 4-5 Checklist for power cable and PGND cable connections
No. Item
1 The power cables and PGND cables comply with the requirements of local
regulations.
LampSite
Installation Guide 4 Installing an RHUB
Issue 02 (2014-05-27) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
40