5.8 Checking the pRRU Hardware Installation
pRRU hardware installation checking includes hardware and cable installation checking.
Table 5-8 lists the hardware installation checking items.
Table 5-8 Hardware installation checking list
No. Item
1 Ensure that the pRRU is not grouned.
2 The position for each device conforms to the engineering design and meets the
space requirement.
3 Ensure that the pRRU is properly installed.
4 The surface of the pRRU is neat and clean. The external paint is intact. The labels,
tags, and nameplates are correct, legible, and complete.
Table 5-9 lists the check items of the signal cable connection.
Table 5-9 Checklist for the signal cable connection
No. Item
1 The connectors of the signal cables must securely connected.
2 The connectors of the signal cables are intact.
3 The signal cables are intact.
LampSite
Installation Guide 5 Installing a pRRU