14 – English
Assembling
1. Clean and lubricate with grease before
assembling new bushings.
2. Hold the lift arm (6) in place and t the threaded
bolt (3) and washers (4), (7), and nylon spacer (5).
3. Fit the shaft (1) with washers (9), (10).
4. Tighten rst according to the table.
5. Then loosen the threaded bolt (3) until the nut
(8) starts to rotate.
6. Assemble remaining parts in the reverse order.
7. Lubricate the rear bushing through the grease
nipple and oil the front bushing.
5
3
1
6
4
2
8095-251
1. Shaft with lug and grease nipple.
2. Screw
3. Threaded bolt
4. Washer
5. Nylon spacer
6. Lifting arm
7. Washer
8. Nut
9. Washer
10. Washer
11. Circlip
Chassis
Changing Link Stay
Tools Dimension Quantity
Torx T30 1
Combination
wrench
15 mm 1
Combination
wrench
17 mm 1
Socket wrench 15 mm 1
Socket wrench 17 mm 1
Breaking bars 1
Torque wrench 1
Ring end for
torque wrench
17 mm 1
1. Apply park brake.
2. Remove the cover over the rear transmission.
3. Place a jack assembly as illustrated and
stabilize the mower, so that it does not fall when
the link stay is dismantled.
8095-343
1
1. Area for jack assembly