EasyManuals Logo

Huvitz HLM-1 User Manual

Huvitz HLM-1
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
21
HPE-
8000X
HPE-
8000X
HLM-1
Equipment Installation and Preparation
6.1. Parts Inspection
1. Inspect supplementary articles.
Open the box and make sure all articles are there
(dust cover, User Manual and etc.).
2. Remove protection tapes.
Remove protection tapes on lens holder, lens cap, marking lever.
6.2. Start-up Test
1. Connect power cable.
Connect the cable to the power consent on the bottom parts of equipment to provide
power.
2. Inspect initial state.
Make sure the equipment operates properly after turning on the power switch. While
the equipment is starting up, check to see of there are not any objects placed on the
lens cap. If a problem occurs during start up, LCD screen will display the message
below:
When an error message appears as the below, check the lens cap or pinhole. Inspection
process during start up is as the following:
6

Other manuals for Huvitz HLM-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huvitz HLM-1 and is the answer not in the manual?

Huvitz HLM-1 Specifications

General IconGeneral
BrandHuvitz
ModelHLM-1
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals