92. Drive assembly ........... 100
93. Drive locations in a 2076-92F expansion
enclosure ............. 101
94. Remove the drive assembly ....... 102
95. Location of secondary expander modules 104
96. Location of LEDs on the secondary expander
module ............. 104
97. Remove the secondary expander module 106
98. Secondary expander module connectors 106
99. Secondary expander module removed from
the enclosure............ 107
100. Expansion canister .......... 108
101. Removing the expansion canister ..... 108
102. Fan module LED .......... 109
103. Fan module release tab ........ 110
104. Remove fan module ......... 110
105. Fan module LED .......... 111
106. Location of the FIB cover ....... 112
107. Loosen the FIB screws ........ 113
108. Remove the FIB from the chassis ..... 113
109. FIB parts removed from the chassis .... 114
110. Removing the display panel assembly 117
111. Display panel assembly ........ 118
112. Display panel assembly ........ 120
113. Installing the display panel assembly 121
114. Remove the rail assembly from the front
frame bracket ........... 121
115. Remove the rail assembly from the rear frame
bracket.............. 122
116. SAS cable connector orientation ..... 122
117. Connecting the SAS cables ....... 124
118. SAS port orientation on expansion enclosures 125
119. Features on the front of the 2076-92F
expansion enclosure ......... 126
120. Secure power cables ......... 127
121. Power and SAS cable connections on the back
of the enclosure ........... 128
122. Features on the rear of the 2076-92F
expansion enclosure ......... 128
123. LEDs on the front of the expansion enclosure 130
124. LEDs on the front of a power supply unit 131
125. LEDs on a drive assembly ....... 132
126. LEDs on a secondary expansion module 133
127. LEDs on drives and SEMs ....... 134
128. LEDs on the back of the expansion enclosure 135
129. LEDs on the back of the expansion canister 136
130. Connecting the Ethernet cables...... 139
131. Example configuration with Ethernet cables
connected to 10 Gbps iSCSI-FCoE 4-port host
interface adapters .......... 140
132. Example configuration with two Fibre
Channel cables per canister ....... 141
133. Example configuration with four Fibre
Channel cables per canister ....... 141
134. Routing the power cables through the cable
retainer ............. 144
135. Expansion canister LEDs........ 144
136. Node canister LEDs ......... 145
137. Storwize V7000 technician port ..... 150
vi Storwize V7000 Gen2 and Gen2+: Quick Installation Guide