EasyManuals Logo

ibss Group, Inc. GV10 Downstream Asher Series User Manual

ibss Group, Inc. GV10 Downstream Asher Series
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #36 background imageLoading...
Page #36 background image
Rev 2015-03-02 36
ibss Group
GV10x OPERATION AND SAFETY MANUAL
Appendix G: Revision History
April 28, 2014
All references to Run Hours Maximum Value changed from 49 to 99.
All references to GV10x Controller Power Requirement changed from 115-235VAC to
100-240VAC.
Page 3 Warnings: Added safety statement regarding use of equipment in a manner not
specified by manufacturer. (This warning required for CE compliance, do not remove.)
Section 3.3.3 (3.3. Connect GV10x Source to Controller): Added advisory statement
regarding position of equipment such that power cord removal is not restricted. (This
statement required for CE compliance, do not remove.)
May 30, 2014
Added Appendix H for image of 2014 CB Test Certificate #US/5120/ITS.
June 10, 2014
Page 4: Warranty period changed from one to 3 years.
Section 3.2: added to NOTES a SAFETY CHECK warning about closing isolation
valves, etc before power on.
Section 3.3.4 (3.3. Connect GV10x Source to Controller): revised wording for connecting
pirani cable.
Section 4.1.3 (4.1. How to Set Operating Parameters): Figure 4-5 updated to show
operating pressure value and button to toggle display units.
Section 4.2.1.3 (4.2. How to Run the GV10x Downstream Asher): revised note (inset
box) regarding 0.5 micron filter.
January 10, 2015
Added appropriate note to each topic/subtopic in this manual when it applies to only
select GV10x Systems.
Page 4: Updated CB Test Certificate number/date and SEMI report number/date.
Section 1: Inserted sub-section notation 1.1 About the GV10x.
Section 1: Added sub-sections: 1.2 GV10x System Models, 1.3 GV10x Controller
Models, and 1.4 GV10x Source Models.
Appendix C: Added a supplemental API specification with new commands. This
supplemental API is applicable to any GV10x Controller manufactured after January 15,
2015.
Section 4.1.2.2 (4.1 How to Set Operating Parameters): Added statement about operating
the GV10x 2U Controller with GV10x-RC15 software. Text and Figures 4.3a and 4.3b
changed to reflect reordering of parameters in BT (benchtop) Controller text panel.
Ignite_Watt and Ignite_Secs have also been renamed to Watt_Ign and Secs_Ign. Figure
4-3c has been added. New Setup parameters added: Watt_Min, Watt_Max, MKS/Pfeiffer,
Pres_Trg,
Section 4.1.3.3: Added GV10x-RC15 Remote Control Software screenshots and
instructions for setting new parameters located on Setup tab.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ibss Group, Inc. GV10 Downstream Asher Series and is the answer not in the manual?

ibss Group, Inc. GV10 Downstream Asher Series Specifications

General IconGeneral
Brandibss Group, Inc.
ModelGV10 Downstream Asher Series
CategoryController
LanguageEnglish