ibss Group, Inc. GV10 Downstream Asher Series User Manual

ibss Group, Inc. GV10 Downstream Asher Series
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ibss Group, Inc.
© 2015
GV10x Downstream Asher
Operation and Safety Manual
Question and Answer IconNeed help?

Do you have a question about the ibss Group, Inc. GV10 Downstream Asher Series and is the answer not in the manual?

ibss Group, Inc. GV10 Downstream Asher Series Specifications

General IconGeneral
Brandibss Group, Inc.
ModelGV10 Downstream Asher Series
CategoryController
LanguageEnglish

Summary

Warnings

GV10x System Certifications

Introduction

1.1 About the GV10x

Details the intended use and function of the GV10x Downstream Asher for hydrocarbon contamination removal.

1.2 GV10x System Models

Describes the two physical components of the GV10x System: the Source and the Controller.

1.3 GV10x Controller Models

Compares the BT and 2U GV10x Controller models, detailing their features and differences.

1.4 GV10x Source Models

Details the P3, P4, and P5 GV10x Source models, including their dimensions and capabilities.

Unpacking the GV10x

2.1 Unpacking and Inspection

Provides instructions for visually inspecting the GV10x components upon arrival and retaining packing materials.

2.2 Repacking for Shipping

Outlines the procedure for repacking GV10x components for return shipment, including RMA requirements.

2.3 Recycling

Details guidelines for recycling the GV10x DS Asher at the end of its lifecycle.

Installing

3.1 Facilities Requirements

Refers to Appendix A for technical specifications related to facilities requirements for the GV10x.

3.2 Connect GV10x Source to Vacuum Chamber

Step-by-step guide for mounting the GV10x Source to a vacuum chamber and verifying correct installation.

3.3 Connect GV10x Source to Controller

Details the hazardous energies and connection steps for linking the GV10x Source and Controller.

3.4 Select Ashing Gas

Explains the selection of appropriate ashing gases like room air or O2/Ar mixtures and safety considerations.

Operating

4.1 How to Set Operating Parameters

Describes methods for setting operating parameters via the BT Controller front panel or remote software.

4.1.2 Setting Parameters from GV10x-BT Controller Front Panel

Details the process of setting operating parameters using the GV10x-BT controller's front panel interface.

4.1.3 Setting Parameters with Remote Control Software

Explains how to set GV10x operating parameters using remote control software via a PC connection.

4.2 How to Run the GV10x Downstream Asher

Provides step-by-step instructions for operating the GV10x Downstream Asher, including plasma ignition.

4.3 How to Tune the GV10x Source

Guides users on tuning the GV10x Source to minimize reflected power and maximize delivered power.

4.4 Changing the GV10x Asher Operating Pressure

Explains how to adjust the operating pressure of the GV10x Asher using the Variable Constriction Needle Valve.

Shutting Down / Locking Out

5.1 Shutdown Procedure

Details the orderly procedure for shutting down the GV10x equipment.

5.2 Lockout Procedure

Describes the steps for locking out energy isolating devices for safety during maintenance or repair.

5.3 Release Procedure

Outlines the steps for safely releasing the GV10x from an isolated state and returning it to service.

Appendix A: Technical Specifications

A.1 GV10x Plasma Source (P3, P4, P5 models)

Lists detailed technical specifications for the GV10x Plasma Source models.

A.2 GV10x RF Controller (BT and 2U models)

Provides technical specifications for the GV10x RF Controller models.

Appendix B: Safety Considerations

B.1 Hazards Inherent in Equipment

Details hazards present within the Controller and Source enclosures and recommended safety procedures.

B.2 Hazard Alerts: Location on Equipment and Meaning

Explains the meaning and location of various warning and caution alerts on the GV10x equipment.

B.3 Inspection of System Equipment

Specifies inspection requirements for the GV10x Source and Controller on a daily and periodic basis.

B.4 Safety Interlocks

Describes the GV10x safety interlock system, its location, hazards protected, and activation conditions.

B.5 Training Requirements

Specifies the experience level required for operating the GV10x and the necessary training.

B.6 Emergency Contact Information

Provides contact details for ibss Group Customer Service for emergencies or inquiries.

B.7 Applicable Laws and Regulations

Advises adherence to local and national codes for safe installation and operation.

Appendix C: GV10x Remote Control Specifications

Appendix D: GV10x Remote Control Test Report

Appendix E: GV10x Asher Source Patents

Appendix F: Tables and Figures

Appendix G: Revision History

Appendix H: CB Test Certificate (copy)

Appendix I: CE Declaration of Conformity (copy)