27
INSTALLATION
Ideal Logic Code Combi - Installation and Servicing
29
ASSEMBLING THE ROOF FLUE KIT
from the top of the boiler, it is necessary to cut both pipes of
assembly A, then ensure they are cut equally leaving the inner
1.
2. Fit the vertical connector (supplied separately) in accordance
with the in the instructions provided with the vertical connector
3.
4. Engage the clamp in its slide mechanism and push it horizontally
5.
6.
Note. Check the position of the inner ue duct relative to the outer duct on the
assembled extension duct(s) and ensure the terminal ue duct is cut longer than the
air duct to ensure engagement in the nal ue duct seal.
7.
ASSEMBLY A
2
Extension
Duct
Vertical
connector
5
4
206279-10272
206279-1.indd 27 06/01/2011 09:10:16