EasyManua.ls Logo

Ideal Boilers LOGIC Code Combi 26 - Heat Engine Renewal; Expansion Vessel Recharging & Replacement

Ideal Boilers LOGIC Code Combi 26
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
SERVICING
Ideal Logic Code Combi - Installation and Servicing
74
HEAT ENGINE RENEWAL
Refer also to Frame 6 - ‘Boiler Exploded View’
IMPORTANT
Before starting the removal procedure, protect the gas and

1. 
2. 
3. 

4. 

5.

6. Remove the ignition and detection electrodes and divertor

7. 
8. 
9. 

10. 
11. Remove the 2 M5 screws retaining the gas valve mounting

12.
13. Undo the return pipe union nut and remove the retaining

14. Unclip and disconnect the DHW pipe off the brass inlet

15. 
16.

17. 
18. Remove the Heat exchanger, slide to the right out of location

19. Reassemble in reverse order, ensuring the heat exchanger



17
13
15
11
When replacing the spring clips located on the return
pipe connection, ensure clip is oriented to correctly match

20. 
21. 
22.
75
EXPANSION VESSEL RECHARGING & REPLACEMENT
10
RECHARGING
1. 
2. Relieve system pressure through CH drain point (Refer to

3. 
4. 
5. Re-assemble in reverse order
6.


REPLACEMENT
7. 
8. 
9.

10.

from the securing clamp, located on the top of the boiler, and

11. 
12.
13.
14. 
15.


3
SERVICING
206279-1.indd 51 06/01/2011 09:10:46

Related product manuals