EasyManua.ls Logo

Ideal Boilers LOGIC Code Combi 26 - Page 45

Ideal Boilers LOGIC Code Combi 26
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
SERVICING
Ideal Logic Code Combi - Installation and Servicing
3G9690
1. 
Note: Ensure condensate trap is
fully drained before removal.
2. 

3. Disconnect the condensate

4. Remove the cleaning plug
5. 

6. 
7. When reassembling ensure

8. 
59
CONDENSATE TRAP/SIPHON REPLACEMENT
60
MAIN PCB REPLACEMENT
Note. Fit the earth strap provided with the PCB
to your wrist and secure to a suitable earth on
the boiler chassis.
1. 
2. 
3. Remove the 2 screws retaining the control

4. Carefully lift the 4 retaining clips and remove

5. 
including the ribbon cable (to facilitate
ribbon cable removal, ease side clips apart
and pull upwards), also where applicable,
push the small plastic clip with an electrical

6. 


7. 
appropriate Boiler Chip Card (BCC) to it (this
should correspond to the output of the boiler:
 Note. Ensure the
correct orientation of BCC by placing “TOP”
side up as shown.
8. 
9. 
10. 
moments the display will start alternating

fully clockwise and when the display shows


Finally move the knob into the required

11.

4
3
3
4
5

Clip
5
2

Ribbon
Cable
Connection
7
Note that production boiler PCBs are factory pre-set to operate for boiler range and output, but when ordering Primary PCB as a
spare, an additional Boiler Chip Card (BCC) MUST also be purchased for your specic boiler range and output.
SERVICING
206279-1.indd 45 06/01/2011 09:10:38

Related product manuals