2.28 CONTROLS CONFIGURATION, COMMISSIONING AND TESTING
A. ELECTRICAL INSTALLATION
1. Checks to ensure electrical safety should be carried out
by a competent person.
2. ALWAYS carry out the preliminary electrical system
checks, i.e. earth continuity, polarity, resistance to earth
and short circuit, using a suitable meter.
WARNING. Whilst effecting the required gas soundness test and purging air from the gas
installation, open all windows and doors, extinguish naked lights and DO NOT SMOKE.
TO QUALIFY FOR FREE COMMISSIONING, BOILERS MUST BE COMMISSIONED WITHIN 3 MONTHS OF INSTALLATION.
TO ARRANGE COMMISSIONING REFER TO CONTACT DETAILS ON BACK PAGE.
B. GAS INSTALLATION
1. The whole of the gas installation, including the meter,
should be inspected and tested for soundness and then
purged in accordance with the recommendations of the
relevant standards listed on page 8, by the installer.
In IE refer to I.S.813:2002.
Connecting Multiple Room Sensors
ConnectingMultipleRoomSensors
One Two Three Four
Note.
Wheremultiplesensorsareusedtheoverallaccuracyoftemperaturemeasurementisreduced,thiscanbecompensatedforbytrimmingtheparallelresistors
Sitingofmultipleroomsensorsforlargespacesshouldbecarefullyconsideredtoavoidsignificanttemperaturedifferencesbetweensensors
Sensor1 Sensor3
Sensor3 Sensor4Sensor2
10kΩ
1%
0.25W
Sensor3Sensor1
10kΩ
1%
0.25W
10kΩ
1%
0.25W
Sensor1 Sensor1
Sensor2
35
Installation & Servicing
SECTION 2 - INSTALLATION
INSTALLATION

Table of Contents

Other manuals for IDEAL EVOMAX 2 30

Related product manuals