21
assEMBLINg ThE ROOF FLUE KIT
from the top of the boiler, it is necessary to cut both pipes of
assembly A, then ensure they are cut equally leaving the inner
1.
2. Fit the vertical connector (supplied separately) in accordance
3.
4.
5.
Note. Ensure turret sample points are servicable and all caps and
plugs are tted.
6.
Note. Check the position of the inner ue duct relative to the outer duct on the
assembled extension duct(s) and ensure the terminal ue duct is cut longer than the
air duct to ensure engagement in the nal ue duct seal.
7.
assEMBL y a
2
Extension
Duct
Vertical
connector
5
4