Digging a trench with 2% slope
106
Method 2: Using a surveyor’s stake as the reference point
• Click on the “Slope” button, then choose
Single or Dual Slope.
• Choose the direction of the slope you wish
to dig.
• Enter the % of slope that you want.
• Click on the green check mark to validate.
• Align the cab to the main slope axis and
follow the directions on the screen.