Installation Procedures – Dozer Calibration
67
• The Grade-to-Blade feature
REQUIRES that your machine
have the Big Combo Sensor
installed and paired with the
system instead of the
standard Combo Sensor.
• There must also be a Mini
Sensor installed and paired
with the system on one of
the dozer blade arms.
• To replace your Standard
Combo Sensor with the Big
Combo Sensor without
having to recalibrate the
whole machine, follow the
instructions on the next 3
pages. Otherwise continue
with the Calibration
procedures on page 71.
Standard Combo Sensor
Big Combo Sensor