2. Preparation
2.1 Installation Location
Make sure that the following requirements are met:
the installation location is level and can withstand the floor loads.
the transportation routes to the installation location do not include steps or staircases.
the shipping crates can be deposited close to the installation location and their presence does not
prevent the machine from being assembled.
the aisle width from the unloading location to the installation location is at a minimum the width
required for the dimensions of the packing crates.
the electrical and air connections meet the requirements listed in the technical data.
the installation location is well-lit.
At least 1 meter of space is available all around the cutting system for service and daily operation.
2.2 Personnel
Make sure that the following requirements are met:
the support personnel wear safety clothing and work gloves.
the support personnel are familiar with the hazards associated during machine installation and have
read and understood the mounting instructions.
2.3 Power Requirement
Three
-phase
Vacuum
Pump
Voltage
Electric
Current
Air
Circuit
Breaker
Wire
Size
Wiring System
5.5KW
380V
8.3A
20A
6mm²
L1L2L3NG
7.5KW
380V
12A
20A
6mm²
L1L2L3NG
Three
-phase
Vacuum
Pump
Voltage
Electric
Current
Air
Circuit
Breaker
Wire
Size
Wiring System
5.5KW
220V
14.5A
30A
6mm²
L1L2L3G
7.5KW
220V
20A
50A
8mm²
L1L2L3G