EasyManua.ls Logo

IFM efector 160 LR3000 - Probe Installation Details; Coaxial Probe and Rod Installation

IFM efector 160 LR3000
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
UK
Unit with coaxial probe6.1.2
There are no minimum distances •
to the tank wall and the baffles (B)
required�
Minimum distance to the bottom of •
the tank: 10 mm�
The vent hole (A) must not be •
covered by mounting elements or
similar
Do not install the unit in the im-•
mediate vicinity of a fill opening� No
water jets must enter into the holes
of the coaxial pipe�
A
B
10mm
Note in case of foam formation: the vent of the coaxial pipe must be above •
the maximum level� The lowest opening of the coaxial pipe must be below the
minimum level�
Installation of the probe6.2
Rod and coaxial pipe are not included in the scope of deliveryThey must be
orderedseparately(→3Itemssupplied).
Installation of the rod6.2.1
Fixing of the rod:
Screw the rod to the unit and tighten
it�
Recommended tightening torque:
4 Nm�
For ease of installation and removal
the rod connection can be rotated with-
out restriction� Even if rotated several
times there is no risk of damage to the
unit�
6
Lmin
L
Lmin = 10 cm
In case of high mechanical stress (strong vibration, moving viscous media) it may
be necessary to secure the screw connection, e�g� by a screw retaining com-

Table of Contents

Related product manuals