EasyManua.ls Logo

IHI IC50 - Break-in Operation

Default Icon
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
IC50 ENG 3-6
“BREAK-IN” OPERATION
NOTICE
If a new machine is used in severe conditions, its
performances are deteriorated early and the
service life becomes shorter. Break in a new
machine for about 100 hours first.
Pay attention to the following when breaking in a new
machine.
Warm up the machine sufficiently.
Do not apply heavy loads to the machine or run it at
high speed.
Run the machine at approximately 80% of the
maximum engine speed.
Place loads of approximately 80% of the maximum
loading capacity.
Do not start or accelerate quickly or stop unnecessarily.
Do not change the direction quickly.
Warm-up operation

Table of Contents

Related product manuals