EasyManua.ls Logo

Immergas Victrix Pro 80 2ErP - 1.13 Immergas flue systems.

Immergas Victrix Pro 80 2ErP
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
(A)
(B)
10
15
INSTALLER
USER
MAINTENANCE TECHNICIAN
Note: this graph is prepared with the oset value (P15) at 30°C (default value). By changing the oset value, the origin of the ow
temperature curve will also change accordingly and not the inclination.
Ex: with Oset = 40 the graph origin is 40 and not 30 °C and curve 5 with TE = -4°C, TM goes from 60°C to 70°C.
1.13 IMMERGAS FLUE SYSTEMS.
Immergas supplies various solutions separately from the boilers
regarding the installation of air intake terminals and ue exhaust,
which are fundamental for boiler operation.
ATTENTION:
the boiler must be installed exclusive-
ly with an original Immergas “Green
Range” inspectionable air intake system and
ue gas extraction system made of plastic,
with the exception of the C6 conguration, as
required by the regulations in force and by the
product’s approval.
is ue can be identied by an identication
mark and special distinctive marking bearing
the note "only for condensation boilers".
e plastic pipes cannot be installed outdoors,
for tracts longer than 40 cm, without suitable
protection from UV rays and other atmos-
pheric agents.
Conguration type B, open chamber and fan assisted. e
boiler leaves the factory with type “B
23
” conguration.
Air intake takes place directly from the environment in which
the boiler is installed via relevant slots made in the back of the
boiler and ue exhaust in the individual ue or to the outside.
Boiler with this type of conguration are classied as type B
23
(in accordance with standard EN 297 and relative standards in
force).
With this conguration:
- air intake takes place directly from the room in which the
appliance is installed;
- the ue exhaust must be connected to its own individual ue
or channelled directly into the external atmosphere.
- Type B open chamber boilers must not be installed in places
where commercial, artisan or industrial activities take place,
which use products that may develop volatile vapours or sub-
stances (e.g. acid vapours, glues, paints, solvents, combustibles,
etc.), as well as dusts (e.g. dust deriving from the working of
wood, coal nes, cement, etc.), which may be harmful for the
components of the appliance and jeopardise operation.
Type C conguration, sealed chamber and fan assisted. e
boiler leaves the factory with “B
23
” conguration, to change the
conguration of the boiler to type “C” (sealed chamber and fan
assisted), disassemble the 80 Ø adapter, the bracket and the gasket
present on the boiler cover and install the designated ue.
Positioning of the gaskets (black) for “green range” ue ex-
traction systems. Position the gasket correctly (for bends and
extensions) (Fig. 10):
- gasket (A) with notches, to use for bends;
- gasket (B) without notches, to use for extensions;
N.B.: if component lubrication (already carried out by the man-
ufacturer) is not sucient, remove the residual lubricant using
a dry cloth, then to ease tting coat the parts with talc, supplied
in the kit.

Table of Contents

Other manuals for Immergas Victrix Pro 80 2ErP

Related product manuals