B
23
B
23
B
23
B
23
B
23
1
2
1
15 16 17
18 19
19
INSTALLER
USER
MAINTENANCE TECHNICIAN
1.17 INSTALLATION OF VERTICAL TERMINALS 80 Ø.
Conguration type B, open chamber and forced draught.
80 Ø Vertical kit (plastic for indoor applications).
Kit assembly (Fig. 15): install the 80 Ø terminal (2) on the central
hole on the boiler up to stop, making sure that the wall sealing
plates (1) have been tted. is will ensure the sealing eciency
of the kit components.
• Maximum length (MAX L) (Fig. 16). e kit with this cong-
uration can be extended up to a max. measurement of 28.0 m
with Victrix Pro 80 2ErP, 14.0 m with Victrix Pro 100 2ErP and
8.5 m with Victrix Pro 120 2ErP, including the terminal.
Using the Ø 80 vertical terminal for direct discharge of the com-
bustion products, the terminal must be shortened (see quotas g.
17). e wall sealing plate (1) must also be inserted in this case
going up to stop on the boiler cover.
80 Ø Vertical kit (steel for outdoor applications).
Kit assembly (Fig. 18): install the 80 Ø terminal (1) on the central
hole on the boiler up to the stop, ensuring the sealing eciency
of the kit components.
e 80 Ø steel terminal is used to install the boiler outdoors with
a direct exhaust. e terminal cannot be shortened and once it is
installed it will extend out by 630 mm (Fig. 19).
e kit includes:
N° 1 - Steel 80 Ø exhaust terminal (1)
e kit includes:
N° 1 - Ring (1)
N° 1 - 80 Ø
exhaust
terminal (2)