Maintenance Summary - Care activities
It is recommended to document the maintenance activities carried out by using the appropriate
maintenance log. The maintenance log has the document number LP1702.10031 - 05.06.2019.
The maintenance interval is highly dependent on the production and environmental conditions of the
machine. The determination of the appropriate interval must be made by the operator.
The maintenance interval should be between once per shift and once a week!
A010 - Check work area door and viewing glass
A020 - Check hydraulic system (visual inspection)
A040 - Check pneumatic system (visual inspection)
A060 - Check filter on control cabinet cooling fan
A070 - Check filter on air conditioner cooling fan
A075 - Checking fill levels of the fluid tanks
A080 - Clean and lubricate clamping device
A090 - Check electrical lines (visual inspection)
A095 - Visual inspection of all fluid lines and electrical cables
A100 - Clean cooling lubricant outlet on clamping cylinder
A110 - Clean filter screens on chip conveyor
A120 - Check cooling lubricant (visual inspection)
A128 - Check coolant
A147 - Check work area light (visual inspection)
A180 - Clean the work area
A190 - Checking the wiper of counter spindle guide in the work area
A230 - Cleaning the chip conveyor
A280 - Clean labyrinth ring of spindles
Maintenance Summary - Care activities
6
Maintenance Instructions
C200
LP1702.10021 - 05.06.2019