6-4 Maintenance
kina40e 06.fm technical handbook(1007)
7 Insert the new calibrated leak and feed the cable with the plug through the hole.
8 Secure with the screw. Please make sure that the rubber seal is firmly in place and
that the outlet opening of the calibrated leak is positioned approximately at the
middle of the opening for the calibrated leak.
9 Switch off the HLD5000 on and run a new calibration after about 5 minutes.
A residual amount of refrigerant might be left under pressure (more than 5 bar) in the
canister of the empty leak standard. Therefore the COOL-Check must be disposed
PROPERLY - following the local, state and national regulations - or must be sent
back to INFICON / your supplier.