EasyManua.ls Logo

Ivoclar digital PrograMill One - Cleaning and Maintenance Table

Ivoclar digital PrograMill One
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cleaning and Maintenance Work for the User
126
9.1 Cleaning and maintenance table
The operator is solely responsible to observe the cleaning and maintenance intervals stated
below.
In some cases, you will receive additional information in the main menu [ToDo] or in the status
display in the main menu [Cases] in the tab [Selected], see column [Interval].
Duties Responsible person Interval Reference
Change / refill water
in the tank
Operator According to app
notifications
“Changing/
Refilling the
water in the main
tank and
changing the
filter”, page 83
Change the filter Operator According to app
notifications
Automatic cleaning
program of the
milling chamber
Automatic cleaning
by the system
without
intervention by the
operator
The machine will
perform cleaning
automatically
depending on the
number of
processed milling
jobs
“Performing the
automatic
cleaning
procedure”,
page 127
For automatic
cleaning, the
cleaning tool
must be inserted
into the material
and tool changer
Manual cleaning of
the milling chamber
Operator Depending on the
situation:
1x per week
before the
weekend
before longer
standing times
If necessary, in
case of visible
contamination
Before processing
zirconium oxide
“Carrying out
manual cleaning
work on the
housing and in
the milling
chamber”,
page 128
“Special
procedure to
process zirconium
oxide”, page 81

Table of Contents