4.2 Preparing the truck for operation
8
Switching on the truck
Requirements
For checks and operations to be performed before starting daily operation, see
page 37.
On-board charger mains plug (34) disconnected.
Procedure
Pull out the Emergency Disconnect switch (3).
Switch on the truck. To do this:
Insert the key in the key switch (37) and turn it to the right as far it will go.
Test lifting (39) and lowering (38) by applying the control button.
Test the brakes (8).
Truck is operational.
3
34
38
39
37
40
04.16 en-GB

Table of Contents

Other manuals for Jungheinrich HC 110

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jungheinrich HC 110 and is the answer not in the manual?

Jungheinrich HC 110 Specifications

General IconGeneral
BrandJungheinrich
ModelHC 110
CategoryForklifts
LanguageEnglish

Related product manuals