Table 27: Site Preparaon Checklist
(Connued)
Item or Task For More Informaon Performed By Date
Rack or Cabinet
Verify that the rack or cabinet
meets the minimum requirements
for installing the switch.
• "Rack Requirements" on page
90
• "Cabinet Requirements" on page
92
Plan rack or cabinet locaon,
including required space
clearances.
Secure the rack or cabinet to the
oor and building structure.
Cables
Acquire cables and connectors:
• Determine the number of
cables needed based on your
planned conguraon.
• Review the maximum distance
allowed for each cable. Choose
the length of the cable based
on the distance between the
hardware components being
connected.
Plan the cable roung and
management.
Wall