EasyManua.ls Logo

Keysight 6 Series User Manual

Keysight 6 Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Keysight i3070 Series 6
In-Circuit Test System
Site Preparation
Question and Answer IconNeed help?

Do you have a question about the Keysight 6 Series and is the answer not in the manual?

Keysight 6 Series Specifications

General IconGeneral
Display12.1-inch capacitive touch screen
Input CouplingAC, DC, GND
TypeMixed Signal Oscilloscope
Channels4 analog, 16 digital
Input Impedance1 MΩ
InterfaceUSB, LAN, HDMI, GPIB (optional)
Operating Temperature0 °C to +50 °C

Summary

Site Preparation Process

Importance of Site Preparation

Explains why site preparation is critical for the i3070 system.

Responsibilities Overview

Summarizes Keysight's and customer's site preparation duties.

Site Preparation Steps & Checklist

Details the process phases and provides a checklist for site tasks.

Planning

System Plan Drawing

Guidance on creating a drawing for site preparation planning.

Assigning Specialists

Defines roles and responsibilities of specialists for site preparation.

Structural Requirements

Floor and Anti-Static Requirements

Covers floor load-bearing, anti-static needs, and precautions.

Moving Access & Dimensions

Details clearance for movement and system dimensions.

Equipment Rating & Storage

Specifies equipment operational ratings and storage guidelines.

RF Attenuation Requirements

Introduction to RF Attenuation

Explains the need for RF attenuation based on standards.

Calculating Site Attenuation

Provides methods for calculating required site attenuation.

Environmental Requirements

Air Quality Requirements

Discusses airborne contaminants and their impact on the system.

Temperature and Humidity

Specifies operating and storage temperature/humidity ranges.

Cooling Requirements

Details heat dissipation estimates for site cooling.

Power Requirements

Customer Power Responsibilities

Defines the customer's role in providing AC power.

Mains Disconnect, Power Drop, and Quality

Covers disconnect, wiring, and power quality assessment.

PDU Configuration and Wiring

Explains PDU re-wiring needs and provides wiring diagrams.

Compressed Air and Vacuum Requirements

Introduction and Primer

Explains system use of air/vacuum and defines key terms.

Compressed Air Specifications

Details pressure, flow rate, and air quality for compressed air.

Vacuum Recommendations

Provides guidelines for vacuum pump selection and installation.

Receiving and Moving Instructions

Receiving the System

Covers inventory, uncrating, and initial placement of the system.

Re-shipping a System

Information on Keysight's services for system relocation.

Related product manuals