Site Preparation Process 1
Site Preparation 1-5
The Site Preparation Process
This section describes the steps of the Keysight system site preparation process.
1 The Site Prep Visit
A Keysight representative will come to your site to discuss what you will need to
do to make your site ready for your system. During this visit, the Keysight
representative will review this manual and answer any questions you may have.
This will help you get started preparing your site.
2 Site Planning
The site planning step is crucial. A little effort invested in understanding and
planning your system will save much effort at installation time. Plan your
system area using chapter 2, Planning. Assign specialists to perform the various
tasks. Make a “system plan drawing” that you and the Keysight representative
can use to install your system. If you need help, call your Keysight
representative. Schedule all site preparation activities.
3 Site Plan Implementation
Implement the plan. Use chapter 3 (Structural Requirements) through
chapter 8, and the system plan drawing. Work with your specialists.
4 Site Verification Visit
The site verification visit allows the Keysight representative to review your
preparations and answer any remaining questions. The Keysight representative
will check your power to verify that it is suitable for the system. The Keysight
representative will also check your compressed air and vacuum hookups.
5 Receiving the System
When the system arrives at your site, remove the crate from the testhead, but
do not remove the system from the pallet. The Keysight representative will
remove the testhead from the pallet. You may inventory the shipment using the
enclosed packing list. You may leave the smaller boxes for the Keysight
representative to unpack when the system is installed. You should move the
system to the site where it will be installed, or a safe storage area.