1-4 Site Preparation
1 Site Preparation Process
Customer’s Responsibilities
While you are primarily responsible for these activities, you can ask the Keysight
representative for advice and information about services offered.
Insurance — You must provide insurance coverage for your system from the
time it is delivered to your facility.
Software Support Contract — You are responsible for initiating and renewing
support contracts for software, documentation updates, and telephone
support. Software support and updates are included during the warranty
period.
Site Preparation and Maintenance — You must supply all labor and materials
used in site construction and maintenance. You are also responsible for
obtaining any building permits and licenses required by local laws and
regulations.
Proper Use of the System — You are responsible for ensuring that use of the
system is consistent with local laws and regulations.
Uncrating — You should remove the crate from the testhead, but not remove
the system from the pallet. The Keysight representative will remove the
testhead from the pallet. You may inventory the shipment using the enclosed
packing list. You may leave the smaller boxes for the Keysight representative to
unpack when the system is installed.
Inspection — You must inspect the system for physical damage. If you believe
that your system was damaged in shipment, call your Keysight representative.
Moving — Moving the equipment from the receiving dock to the installation site
is the customers responsibility. The system should be moved, after the crate is
removed, to an area safe from damage or misplaced boxes.
Wiring and Cabling — Wiring primary power to the system is your responsibility,
as is installing communications cabling to the system. The actual power
connection to the system will be made after the Keysight representative has
removed the system from the pallet and moved it to the desired location.
It will be difficult to remove the crate in a room with less than
2.5 meter (8 foot) clearance.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight 6 Series and is the answer not in the manual?

Keysight 6 Series Specifications

General IconGeneral
BrandKeysight
Model6 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals