1-2 Site Preparation
1 Site Preparation Process
The Importance of Site Preparation
The Keysight i3070 family of in-circuit test (ICT) systems includes complex and
sophisticated automatic test equipment. To ensure that your site is properly
equipped for your new system, and to minimize the possibility of problems or delays
in system installation, you must consider many things during site preparation.
Before calling your local Keysight representative to install your i3070 Series 6
system, read and follow the recommendations provided in this manual.
This manual contains the following chapters:
• Chapter 1, Site Preparation Process (this chapter) discusses your
responsibilities, lists Keysight’s responsibilities, and provides a checklist to use
as you proceed.
• Chapter 2, Planning discusses choosing a site for your system, designing your
site layout, assigning people to do various preparation tasks, and scheduling
your preparations.
• Chapter 3, Structural Requirements describes floor, access, and storage
requirements.
• Chapter 4, RF Attenuation Requirements describes the additional RF
attenuation required as part of the installation to meet the installed radiated
emission limits for some countries.
• Chapter 5, Environmental Requirements describes air quality, temperature,
humidity, and electromagnetic shielding requirements.
• Chapter 6, Power Requirements describes power requirements for the various
parts of the system and mains power connections.
• Chapter 7, Compressed Air and Vacuum Requirements describes the
compressed air and vacuum that the system requires.
• Chapter 8, Receiving and Moving Instructions describes the uncrating,
handling, and re-shipping process for the i3070 system.