8-2 Site Preparation
8 Receiving and Moving Instructions
Receiving the System
Inventory the Shipment
Use the packing list that came with your system to determine if the system was fully
received. Carefully examine the boxes for shipping damage. If you suspect the
system was damaged in shipment, contact your Keysight representative.
Uncrating the System
The customer should remove the crate from the pallet. The Keysight representative
will uncrate the system pallets. Leave the smaller boxes intact for the Keysight
representative to unpack when the system is installed.
Placing the System
• Moving the Testhead
• Make sure all leveling feet are turned up as high as they go before rolling the
system.
• Place the system exactly as the system plan drawing shows. Remember that
the testhead will be rotated up for service and that cable length will be
critical.
• Immobilizing and Leveling the System
• Immobilize and level the testhead by screwing the leveling feet down to the
floor. The testhead may be difficult to unlock or rotate if it is not level.
• If local building codes require equipment to be anchored to the floor due to
potential seismic activity (earthquakes), you will need to bolt the system to
the floor. The shipping brackets used to secure the system to the pallet are
suitable for this purpose, but you will need to supply fasteners suitable for
your situation.