I. Hold the bowl lift arm (1) with large end
of
tapered hole
up. Start bowl lift handle into
the
arm. Hold handle
so
it
is
pointing down. Push it all
the
way through the arm and into
the bearing hole in the column. Place small end
of
tapered
pin ( 1 0) in the arm and drive it through the lift handle.
Be
sure the pin
is
very tight.
J.
Slide
the
new bowl support assembly (14)
on
the column
(13). Place the bowl lift bracket (20) in place through the
support and screw in
the
two
:JI:l0-24
x 1/2" flat head screws
(21
).
These screws must be very tight. Hold the support and
guide
th
e lift rod (3) into the hole in the bracket (20). With
rod extended through the bracket, place the
"V"
washer (5)
on the rod with the point
of
the
"V"
down toward base
of
machine. Then place washer (6) on
the
"V"
washer,
the
spring (7) and the castle
nut
(8). Turn
the
castle
nut
down so
that the tension will be great enough to snap the rod (3)
into
the arm ( 1) and hold
it
there.
K.
Place the base ( 18)
on
the
bottom
of
the colu
mn
( 13) and
screw in
the
four 5 /16" -18 x 3 I
4"
round head screws and
lock washers (15).
Be
sure these screws are very tight to
prevent shaking loose.
L. If
th
e base feet (17) are worn, replace them. To replace
the feet, unscrew the
:JI:8-32
x 1 /2"
round
head screws (16)
and remove
the
old feet. Place the screws in the new feet and
screw the feet to
the
base. Do
not
tighten
so
much
as
to
push
screw through the rubber.
24