EasyManua.ls Logo

KLS Martin marLED E15 - Page 61

Default Icon
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service ManualService Manual
Operating Lights marLEDOperating Lights marLED
®®
E9 / E9i / E15E9 / E9i / E15
V V 1.0 1.0 6161
2 2 Bearing Bearing blockblock
4 4 Cardan Cardan jointjoint
5 5 Connection Connection cablecable
The cardan joint (4) can now be freelyThe cardan joint (4) can now be freely
removed from the bearing block (2). Theremoved from the bearing block (2). The
remaining brake screws remain screwedremaining brake screws remain screwed
on.on.
Remove connection cable (5) and pullRemove connection cable (5) and pull
out of the bearing block (2) towards theout of the bearing block (2) towards the
back.back.
Fig. 6-4: Removing old cardan jointFig. 6-4: Removing old cardan joint
2 2 Bearing Bearing blockblock
4 4 Cardan Cardan jointjoint
5 5 Connection Connection cablecable
Lubricate cardan pin of the new cardanLubricate cardan pin of the new cardan
joint (4) anjoint (4) and insert id insert it into the bt into the bearingearing
block (2) with the connection cables (5)block (2) with the connection cables (5)
first.first.
Fig. 6-5: Inserting new cardan Fig. 6-5: Inserting new cardan jointjoint
6 6 Holding Holding clampsclamps
7 7 Cable Cable tietie
Reattach cables, cable tie (7) andReattach cables, cable tie (7) and
holding clamps (6) according to yourholding clamps (6) according to your
own notes.own notes.
Fig. 6-6: Reattaching the cablesFig. 6-6: Reattaching the cables

Table of Contents

Related product manuals