Operation 5
Backfilling round gravel and precise unloading
• Precise dosing and placement of pourable material.
Advantage of working method:
• Teeth move back from the wall as the bucket opens.
Unloading from the bottom of the bucket for increased tilt-out
heights
Advantage of working method:
• Tilt-out height can be increased by at least 55 cm (21.6 in) (depending
on bucket size), as compared to tilting out with a standard bucket.
• Material can be pushed with the open multipurpose bucket.