Operation
4
Pos: 4.7 /Überschrift en/Überschrift en 2/F-J/F/Foli enbindung vor bereiten @ 369\mod_144 1781613306_78.d ocx @ 2703 315 @ 2 @ 1
2.1 Preparing Film Tying
Pos: 4.8 /Überschrift en/Überschrift en 3/F-J/H /Hinweise zum B etrieb @ 325\m od_14256342 08642_78.doc x @ 2499811 @ 3 @ 1
2.1.1 Notes on Operation
Pos: 4.9 /Beip acks/Rundballe npressen/Folienbin dung/Modulgr uppen Folie einl egen / LED Lich tleiste/Beschrei bung: Hin weise zum Betrie b Folienbindu ng 1_alle Compri ma @ 399\ mod_14472455 26631_78.doc x @ 2827255 @ @ 1
– When starting film tying, it is necessary to pick up crops until the film is grasped by the
round bale and the film roll turns.
– If necessary, use one complete net roll for initial operation first and tie the round bale with
net. In this way, possible sharp edges or paint residues can be removed in advance.
– If there is no possibility to tie with net first, remove possible sharp edges by hand, refer to
chapter “Removing Paint Residues and Welding Residues Before Start-up”.
– KRONE recommends abstaining from tying straw bales with film. There is a danger that
condensation water forms and thus mould results.
– Make sure that the round bale is tied with the appropriate film stretching, refer to chapter
entitled “Checking the Stretching of the Inserted Film”.
– KRONE recommends 3.5 - 4 film layers to ensure an optimum film tying, refer to chapter
“Number of Film Layers”. The dryer the crops, the more film layers are required.
– A machine with film tying can also tie round bales with net. Make sure that the fixed axles
are used for better edge overlap when inserting the net (see label).
Pos: 4.10 /Abkürzu ngen /Abkürzu ngen sprach neutral/Rundballe npressen/Co mprima F/CF @ 3 99\mod_1 44724930328 2_0.docx @ 28275 85 @ @ 1
Comprima F/CF
Pos: 4.11 /Bei packs/Rundball enpressen/Folie nbindung/Mod ulgruppen Folie ei nlegen / LED Lic htleiste/Beschr eibung: Hinw eise zum Betri eb Folienbindung 2_alle Compri ma @ 477\ mod_1473414 840863_78.docx @ 3217996 @ @ 1
• Before applying the film, reduce driving speed and observe the maximum filling level. The
message must not appear on the terminal, see chapter "Error messages".
If appears:
• Start film tying at a lower baling pressure, e. g. 80 %, see chapter "Set baling pressure".
Pos: 4.12 /Layo ut Module /---------------Seitenumbruch---------------- @ 0\mod_119617 5311226_0.docx @ 4165 @ @ 1