EasyManua.ls Logo

L-Acoustics V-DOSC - Figure 91: Stacked V-DOSC Offstage Fill System

L-Acoustics V-DOSC
158 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
L-ACOUSTICS V-DOSC Manual Version 4 6/29/2005 Page 111 of 158
SAFETY RULES
NO MORE THAN 6 V-DOSC ENCLOSURES SHOULD BE STACKED ON ONE BUMP2.
ALWAYS ATTACH ROTATING LEGS AND ANGLE STRAPS BETWEEN ENCLOSURES.
Test the strength of the supporting floor and, if necessary, use plywood sheets or steel plates under
individual screwjack feet in order to help distribute the load.
The maximum downward or upward tilt angle of the bumper is 12 degrees.
When stacking on scaffold platforms, install 2 rear screwjacks only (for downwards tilt) and ratchet
strap the BUMP2 to the platform for improved stability (see Figure 91)
Figure 91: Stacked V-DOSC offstage fill system (Radiohead, Oxford 2003, sound design - F. Bernard)

Table of Contents