EasyManua.ls Logo

Labcyte Echo 550 - Maintenance Schedule

Default Icon
200 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-2 Echo Liquid Handler User Manual
6.1 Maintenance schedule
Echo user maintenance consists of the following:
Daily maintenance
Echo maintenance alerts
Scheduled preventive maintenance
Every two weeks
Every month
Every six months
6.1.1 Daily maintenance
Perform the following checks once a day:
Table 6.1. Daily Maintenance Checklist
Maintenance Task Procedure
Check the coupling fluid bottle level daily.
If the coupling fluid level is at 350 mL or less,
clean and refill the coupling fluid bottle and
add algaecide.
See “
Refill the coupling fluid
bottle” on page 6-8.
If the coupling fluid is cloudy, clean and refill
the coupling fluid bottle and add algaecide.
See “
Clean and refill the
coupling fluid bottle” on
page 6-10.
Check the waste bottle daily (older Echo
systems only). Empty it if it is greater than
half full.
See “
Empty and clean the
waste water bottle” on
page 6-13.
Check the plate insert for proper positioning
or damage.
See “
Source plate insert” on
page 3-6

Table of Contents

Related product manuals