Operating the AUTOMIZER
TM
RECYCLER 65
Figure 4-26
Loading the bucket
NOTE: If recyclables start to pile up in the hopper bucket, lower the container and raise the bucket a
few feet off the ground to move the recyclables further back in the bucket. Lower the hopper
bucket and continue unloading the container inside the bucket.
9. Bring the container to its resting position.
10. Raise the bucket to load recyclables into the hopper.
11. Push the start cycle button (green button) on the packer control station to get the packer
moving.
NOTE: Prior to pushing the green button, ensure that the multi-cycle switch on the packer control
station is set to “ON”. This will enable the packer to perform a preset number of full cycles
once the green button is pushed and allow the operator to “pack on the go” or pack when
driving the vehicle.
Warning!
The maximum weight the hopper bucket can support is 4000 lbs.